
The Hydraulic Bolt Tensioning activity was carried out in April 2026 at a project site in Johor, involving the[…]

The Kick-Off Meeting for the Provision to Overhaul One Unit of Multi-Stage Barrel Pump (GPS) was held on 20[…]

The Provision of (HPWJ) Exchanger Cleaning for TA PCG-PCC 2026 was carried out from 5 April 2026 to 18[…]

The Overhaul of Reactor Hot Water Pump was carried out on 13 April 2026 at the RBPS Workshop and[…]

The Control Valve Servicing activity was carried out on 11 April 2026 at the RBPS Workshop, involving RBPS personnel.[…]

The Resurfacing of Rear Shell 1110-E-003A was carried out on 7 April 2026 at a site in Johor, involving[…]