The Inspection and Cleaning of the Filter Vessel, together with the replacement of the DDF filter element for DJ162, was successfully conducted on 7 May 2026 at PDB Bayan Lepas. This activity formed part of the scheduled preventive maintenance programme aimed at ensuring the continued performance and reliability of the filtration system.
The scope of work included a thorough inspection of the filter vessel, cleaning of internal components, and the replacement of the existing DDF filter element with a new unit. These activities were essential to remove accumulated contaminants, maintain filtration efficiency, and ensure that the system continues to operate within the required performance standards.
All maintenance works were carried out in accordance with established technical procedures and safety requirements. Through proactive maintenance activities such as this, the company continues to support equipment reliability, safeguard fuel quality, and minimise the risk of operational disruptions, ensuring safe and efficient operations at the facility.







Comments are closed