
The PMI Inspection was conducted on 14 January 2026 at Bayan Lepas Airport, involving PDB and RBPS. This inspection[…]

The Dimension Checking for Cooling Water Pump Parts was carried out on 8 January 2026 at the RBPS Workshop,[…]

The Visual Inspection of Bowser Tank BJ214A was conducted on 7 January 2026 at the Enproserve Workshop, involving PDB,[…]

The Vacuum Box Testing activity was conducted on 30 December 2025 at SPCI, Gebeng, by RBPS staff. This activity[…]

The ISO Audit was conducted on 30 and 31 December 2025 at RB Plant Services Sdn Bhd, involving RBPS[…]

The Tank Repair BJ214A activity was carried out at Enproserve, Paka, involving Enproserve and RBPS. The activity aimed to[…]