The Control Valve Servicing activity was carried out on 11 April 2026 at the RBPS Workshop, involving RBPS personnel.[…]

The Resurfacing of Rear Shell 1110-E-003A was carried out on 7 April 2026 at a site in Johor, involving[…]

The Monthly Financial Meeting & YTD) Contractor Performance Review was held on 25 February 2026 at Petronas Penapisan Terengganu[…]

The Onsite External Clamp 2.5m Flange Facing Project was carried out in February 2026 in Johor, involving the FM[…]

The PMI Inspection was conducted on 14 January 2026 at Bayan Lepas Airport, involving PDB and RBPS. This inspection[…]

The Dimension Checking for Cooling Water Pump Parts was carried out on 8 January 2026 at the RBPS Workshop,[…]