Dimension Checking for Cooling Water Pump

The Dimension Checking activity for the Cooling Water Pump parts was conducted on 8 January 2026 at the RBPS Workshop by RBPS as part of scheduled maintenance and overhaul preparation works. This activity is an important step to ensure the accuracy and condition of critical components before proceeding with the overhaul process.

The main objective of this activity was to verify the dimensions of pump components for the Cooling Water Pump PGB-UK, ensuring compliance with design specifications and technical requirements. Accurate dimensional checks help identify wear, deformation, or deviations that could affect pump performance and reliability if left uncorrected.

All inspection and measurement works were performed in accordance with applicable technical procedures and safety standards, reflecting RBPS’s commitment to maintaining equipment integrity and operational reliability. Through systematic inspection and overhaul activities such as this, the company continues to support safe operations, minimise downtime, and extend the service life of critical rotating equipment.

Event Galery

Tags:

Comments are closed